Meyer Burger cuts jobs at US module assembly plant

May 29, 2025
Facebook
Twitter
LinkedIn
Reddit
Email
A Worker Adjustment and Retraining Notification (WARN) filed in Arizona lists 355 employees affected.. Image: Meyer Burger

Beleaguered Swiss solar manufacturer Meyer Burger has reportedly laid off an unconfirmed number of employees at its US module manufacturing facility.

Local Arizona news reports claim that Meyer Burger has cut the workforce at its Goodyear, Arizona module assembly plant. A Worker Adjustment and Retraining Notification (WARN) filed in the state on 22nd May lists 355 employees affected.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

PV Tech has contacted Meyer Burger for clarification of these reports, but the company has yet to respond.

The reports of layoffs are the latest in a string of negative news for Meyer Burger. The company ploughs a relatively lonely furrow in producing heterojunction technology (HJT) solar cells and modules, where much of the industry has currently opted for tunnel oxide passivated contact (TOPCon) technology.

The Goodyear facility was opened in June 2024 following the closure of its module assembly plant in Freiburg, Germany. At the time, the company was also planning to build a 2GW HJT solar cell manufacturing plant in Colorado, though this was abandoned in August.

Just a few months after the Goodyear facility began production, Meyer Burger lost its 5GW US supply deal with D.E. Shaw Renewable Investments (DESRI), the deal which had underpinned the facility’s viability.

Last year, Meyer Burger’s then-CEO, Gunter Erfurt, told PV Tech Premium the company had been “proven right” in choosing to move its operations from Europe to the US. Erfurt resigned as CEO in September 2024, along with a further 1,050 job cuts, and was replaced by Franz Richter later that month.

Throughout this US uncertainty, the company had maintained its solar cell production facility in Thalheim, Germany. In April 2025, it announced a reduction of working hours for around 300 of the site’s employees due to a “bottleneck” in supply and confirmed that the Goodyear, Arizona module assembly facility would henceforth alternate between production and “technical work”.

Alongside these operational challenges, the company’s balance sheets have made for negative reading. Last month, its full-year financial results for 2024 were delayed until 31st May at the latest, following net losses of CHF317 million (US$383 million) in the first half of the year.

The collapse of the DESRI deal also triggered a “restructuring” effort, where Meyer Burger secured around US$40 million in funds to sustain its operations during a transition phase.

In January 2025, the company announced a mergers and acquisitions (M&A) process seeking interested buyers.

Read Next

December 31, 2025
The government of Bahrain has laid the foundation stone for a 100MW solar power plant in the Al Dur area of the Southern Governorate. 
December 31, 2025
As the year comes to an end, we bring you a recap of the most-read stories throughout 2025, with the US taking most of the spotlight.
December 31, 2025
Premier Energies and Waaree have both won module supply orders, while KP Group has signed a MoU with the Government of Botswana. 
December 31, 2025
T1 Energy has completed its first sale of Section 45X production tax credits (PTCs) in a deal valued at US$160 million.
December 31, 2025
PV Tech spoke to JD Dillon of Tigo Energy about its work across different scales of solar operation in the US.
December 30, 2025
Sembcorp has acquired a 100% stake in ReNew Sun Bright for approximately US$191.6 million, through its subsidiary, Sembcorp Green Infra.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 24, 2026
Warsaw, Poland